Project name: Mong Duong 1 Thermal Power Plant (2x500MW)
Investor: Electricity of Vietnam (EVN).
General contractor: Hyundai Engineering & Construction Co., Ltd
Location: Mong Duong Ward, Cam Pha Town, Quang Ninh Province.
Capacity: 2x540MW
Description:
Mong Duong 1 thermal power plant has two units with a total installed capacity of 1,080 MW, annual electricity output of 6.5 billion kWh; was built on an area of 55ha in Zone 3, Mong Duong ward, Cam Pha town, Quang Ninh province.
When put into operation, the plant will generate electricity to the national grid via Mong Duong dual-circuit 500kV line, 500kV Quang Ninh substation.
The plant uses coal fuel, traditional steam condensate thermal power technology, subcritical steam parameters, Circulating Fluidized Boiler (CFB) technology, suitable for low quality Antracite coals of Vietnam, found in large coal mines in Quang Ninh. Coal consumption demand for Mong Duong 1 Thermal Power Plant is about 3 million tons of coal/year.
As planned, unit 1 will be completed and put into commercial operation after 40 months (Q1/2015), unit 2 will be put into operation after 46 months (expected quarter 3/2015).
When the plant is put into operation, it will contribute to enhancing the power supply capacity of the national power system, and at the same time contribute to promoting socio-economic development in the Northeast key economic region of Vietnam.
Scope of work:
Installation of equipment, connecting pipes, underground pipes, insulation, fire fighting systems, painting pipes and receiving equipment:
Mech PKG#3 (Boiler #2 A, B and ESP installation), CFBC boiler & ancillary equipment, elevator and insulation system.
A/G pipe system and truss, fire protection system and paint shop.
U/G HDPE pipe system.
Transport equipment.