Nam Na 2 hydropower project is located in Lai Chau province, started construction in May 2009 and is in the process of installing and finishing machines, with installed capacity Nlm=66MW.
Pleikrong Hydropower Plant was built in Kon Tum province, on the large branch of Krong Poko river in the upper part of the Se San river. All construction items of Pleikrong hydropower project are located in Sa Binh commune, Sa Thay district and Kroong commune, Kontum town.
Son La hydropower plant has a total installed capacity of 2,400 MW, including 6 units, with an average annual power output of over 10.2 billion kWh. Total project investment capital is 42,476.9 billion VND, invested by Vietnam Electricity Group.
Nam Cong 3 Hydropower Plant is invested by LILAMA 10 Joint Stock Company (LILAMA 10, JSC). The installed capacity is 2x4MW and supplied to the grid about 35.4 million kWh/year.
Dung Quat oil refinery has a designed capacity of 6.5 million tons of crude oil per year or 140 thousand barrels of oil per day (22,000m3/day)
The project has a total investment of 9 billion USD, invested by Kuwait International Petroleum Company - KPI, Vietnam Oil and Gas Group, Idemitsu Kosan, Mitsui Chemicals (Japan) and international financial institutions.
Chinfon Cement Factory (1.4 million tons/year)
Nghi Son Cement Factory (2.13 million tons/year).
The capacity of the plant is 1 million tons/year and is the largest cement factory in Cambodia.