Vung Ang Thermal Power Plant 1
Project name: Vung Ang 1 Thermal Power Plant (2x600MW).
Investor: Vietnam Oil and Gas Group (PVN).
EPC General Contractor: Vietnam Machinery Erection Corporation (LILAMA).
Subcontractor: LILAMA 10, JSC
Time: 2010-2013
Capacity: 2x600MW
Describe:
Vung Ang Thermal Power Plant 1 year in Vung Ang Thermal Power Center was built under the Contract of Design, Supply of Equipment, Materials and Construction (EPC Contract).
The contract was signed between the Investor, Vietnam Oil and Gas Group (PVN) and Vietnam Machinery Erection Corporation (LILAMA), which is the EPC general contractor.
Vung Ang 1 is the first thermal power project in North Central Vietnam, which will include two units with a total capacity of 1200MW. The first unit will generate electricity in the fourth quarter of 2013 with an annual power output of 7.2 billion kWh.
Scope of work:
- Providing services of loading and unloading, transporting, maintaining equipment and steel structures.
- Installation of electromechanical equipment for the turbine and generator system